Skip to content

Forestry and Parks - Request for Proposal - ENGINEERING, DESIGN AND CONSTRUCTION ADMINISTRATION CONSULTANT SERVICES - SOUTH KANANASKIS HIKING TRAILS – PRAIRIE MOUNTAIN STAGING DEVELOPMENT - ELBOW FALLS PROVINCIAL RECREATION AREA (PRA)

21 days leftSource: APC
Issuing body
Forestry and Parks
Location
Alberta
Closes

Trades

Scope

Organization: Forestry and Parks PROJECT DESCRIPTION .1 Working towards the outcomes and objectives identified within the FMP, the successful Proponent is to apply proven parks-based (non-urban) technical design practices in conjunction with appropriate tools and skilled resources through the Assessment, Conceptual Design, Detailed Design, Approval Process, Issued for Tender and Issued for Construction and Project Close Out phases for the site to achieve the end result desired by the Province. .2 The work to be accomplished under this project includes: Elbow Falls DUA Parking Lot Scope: .1 Assess the feasibility of adding an additional entrance to Highway 66 from the east side of the Elbow Falls PRA parking lot and creating oneway traffic flow. The feasibility study shall evaluate the constructability, regulatory and safety compliance requirements and adherence to the general objectives outlined in the FMP. .2 Expand and redesign the Elbow Falls PRA parking lot. i. Expand and reconfigure parking lot to increase the parking capacity by 100 standard vehicle stalls, one bus transit stop, and up to 4 pull through RV/bus stalls. ii. Pavement repairs, as required. iii. Refurbishment of existing amenity area including re-gravelling, line painting and general cleanup. iv. Install a third 4-stall vault toilet. v. Install additional waste receptacles. vi. Addition of a 1.2-metre-wide gravel connector trail along the northern edge of the expanded parking lot. vii. Upgrade signage using Alberta Parks standard sign catalogue as needed Installation of one kiosk for Prairie Mountain Trail. Powderface Parking Lot Scope: .1 Assess the feasibility of expanding the Powderface parking lot, as outlined in the FMP. The feasibility study shall evaluate the constructability, regulatory and safety compliance requirements and adherence to the general objectives outlined in the FMP. .2 Redevelop the existing Powderface parking lot. i. Reconfigure existing parking lot to accommodate 25-50

Cornerstone Contracts aggregates this notice. The issuing authority publishes the official documents and is the only authoritative source for requirements and deadlines.

View the official posting

Last checked August 27, 2026

Other open tenders in Alberta

See all open Alberta tenders

Want tenders like this scored to your trade?

Cornerstone scans Canadian public tenders daily and scores each one against your trade, province and bonding capacity. Free to browse.

Get matched