Skip to content

Forestry and Parks - Request for Quotes - Queen Elizabeth Provincial Park 2 - Water Line Replacement

9 days leftSource: APC
Issuing body
Forestry and Parks
Location
Alberta
Closes

Get tenders like this one matched to your trade and emailed to you. Free.

A morning email when new tenders match your trade and province. No credit card.

Get matched free

Bidding on this one? Send us your draft and the tender documents: for CA$450 we check it against what is mandatory and what is scored and fill in the forms, back to you within 48 hours. How the compliance pass works

Trades

Scope

Organization: Forestry and Parks PROJECT BACKGROUND: The distribution water line connecting pump house to the staff house and shop has suffered continuous failures due to its age. PROJECT OBJECTIVE: Replace existing distribution water line to new 50mm HDPE from existing main CC valve at pump house to the existing CC valve at the shop by means of directional drilling. Replace existing distribution water line to new 50mm HDPE from existing main CC valve at pump house to the replaced CC valve at the staff house. SCOPE OF WORK: Contractor is responsible for all necessary equipment, tradesmen, and supplies for the completion of the following scope of work: 1. Any required line locates are the responsibility of the Contractor. 2. Remove steel barrier posts in front of pump house and set aside for reinstalment. 3. Remove front concrete step at pump house and set aside for reinstalment. 4. Partially excavate down to main CC valve, using a step downside method of embankment then expose CC valve along with both existing water line connections by means of hydro-vac. This procedure to be used on all three CC valves. 5. Directional drill new 50mm HDPE water line with 12-gauge wire tracer wire from pump house to existing CC valve in front of the shop. a. All existing fittings and connections will be replaced on existing CC valves. 6. Directional drill new 50mm HDPE water line with 12-gauge tracer wire from pump house to replaced CC valve on east side of the staff house. 7. All existing fittings and connections will be replaced on existing water line from staff house to the replaced CC valve. 8. Pressure test to be completed to the closed existing and replaced CC valves (x3) for a min of 15 minutes, repeated again to the opened CC valves (x2 shop and house) for min of 15 minutes. 9. Once pressure test is confirmed all excavations to be brought up over grade for settlement. 10. Reinstall Barrier posts level, with a minimum of 4’ above ground, similar height prior to rem

Cornerstone Contracts aggregates this notice. The issuing authority publishes the official documents and is the only authoritative source for requirements and deadlines.

View the official posting

First listed November 7, 2026

Other open Alberta tenders in the same trades

See all open Alberta tenders

Want tenders like this scored to your trade?

Cornerstone scans Canadian public tenders daily and scores each one against your trade, province and bonding capacity. Free to browse.

Get matched