Forestry and Parks - Request for Quotes - Queen Elizabeth Provincial Park 2 - Water Line Replacement
- Issuing body
- Forestry and Parks
- Location
- Alberta
- Closes
Get tenders like this one matched to your trade and emailed to you. Free.
A morning email when new tenders match your trade and province. No credit card.
Bidding on this one? Send us your draft and the tender documents: for CA$450 we check it against what is mandatory and what is scored and fill in the forms, back to you within 48 hours. How the compliance pass works
Scope
Organization: Forestry and Parks PROJECT BACKGROUND: The distribution water line connecting pump house to the staff house and shop has suffered continuous failures due to its age. PROJECT OBJECTIVE: Replace existing distribution water line to new 50mm HDPE from existing main CC valve at pump house to the existing CC valve at the shop by means of directional drilling. Replace existing distribution water line to new 50mm HDPE from existing main CC valve at pump house to the replaced CC valve at the staff house. SCOPE OF WORK: Contractor is responsible for all necessary equipment, tradesmen, and supplies for the completion of the following scope of work: 1. Any required line locates are the responsibility of the Contractor. 2. Remove steel barrier posts in front of pump house and set aside for reinstalment. 3. Remove front concrete step at pump house and set aside for reinstalment. 4. Partially excavate down to main CC valve, using a step downside method of embankment then expose CC valve along with both existing water line connections by means of hydro-vac. This procedure to be used on all three CC valves. 5. Directional drill new 50mm HDPE water line with 12-gauge wire tracer wire from pump house to existing CC valve in front of the shop. a. All existing fittings and connections will be replaced on existing CC valves. 6. Directional drill new 50mm HDPE water line with 12-gauge tracer wire from pump house to replaced CC valve on east side of the staff house. 7. All existing fittings and connections will be replaced on existing water line from staff house to the replaced CC valve. 8. Pressure test to be completed to the closed existing and replaced CC valves (x3) for a min of 15 minutes, repeated again to the opened CC valves (x2 shop and house) for min of 15 minutes. 9. Once pressure test is confirmed all excavations to be brought up over grade for settlement. 10. Reinstall Barrier posts level, with a minimum of 4’ above ground, similar height prior to rem
Cornerstone Contracts aggregates this notice. The issuing authority publishes the official documents and is the only authoritative source for requirements and deadlines.
View the official postingFirst listed November 7, 2026
Other open Alberta tenders in the same trades
- City of AirdrieAlberta, AirdrieCloses Nov 24, 2026via APCCivilStormUnderground UtilitiesView on official portal →
- Transportation and Economic CorridorsAlbertaCloses Nov 24, 2026via APCCivilBridgeCulvertMarineDemolition/ClearingView on official portal →
- City of AirdrieCloses Nov 24, 2026via CanadaBuysHTMLCivilView on official portal →
- Transportation and Economic CorridorsAlbertaCloses Nov 25, 2026via APCCivilMarineLandscapingTrucking & HaulingView on official portal →
- Transportation and Economic CorridorsAlbertaCloses Nov 25, 2026via APCPavingConcreteBridgeView on official portal →
- Municipal District of TaberAlberta, Municipal District of TaberCloses Nov 26, 2026via APCCivilBridgeCulvertMarineView on official portal →
Want tenders like this scored to your trade?
Cornerstone scans Canadian public tenders daily and scores each one against your trade, province and bonding capacity. Free to browse.
Get matched